Either I'm not using the right search words, or what I am thinking of is not allowed...
I'd like to bury this cleanout (and the rest of the main stack) in a wall, going the same direction as the cleanout (blue lines = future wall). Could I remove the threaded part, and donut/pvc about a foot out, then 90 degree elbow off of that (long sweep) to be perpendicular with the wall?
Or should I just build the wall in such a way that there is most of the room available in a 16" OC stud spacing, and a huge access panel (say 16" by 16") to be able to get in there and maneuver if necessary?
One side of the wall will be inaccessible (bathroom/tile wall), the accessible side will likely be in a cabinet.
I'd like to bury this cleanout (and the rest of the main stack) in a wall, going the same direction as the cleanout (blue lines = future wall). Could I remove the threaded part, and donut/pvc about a foot out, then 90 degree elbow off of that (long sweep) to be perpendicular with the wall?
Or should I just build the wall in such a way that there is most of the room available in a 16" OC stud spacing, and a huge access panel (say 16" by 16") to be able to get in there and maneuver if necessary?
One side of the wall will be inaccessible (bathroom/tile wall), the accessible side will likely be in a cabinet.