Hello new to forum I live in Suffolk county NY. I’m running a PEX manifold on my garage interior wall. The garage is attached and has living space on one side, the back and above. I’m running PEX to the manifold through floor joists and then coming down into the garage above the manifold. I know the garage needs to be sealed up , 5/8 x dry wall etc. my question is the transition from the joists through the ceiling? I was thinking some form of block between the joist it’s entering through then sheet rock over that then fire stop around each line or is there a more appropriate code correct way? All help is appreciated thank you in advance!