I have posted another thread related to the design of my completely new DWV system as I am remodeling and have a smaller home an everything is sort of centralized in one main area around the stack. With the great help of folks on this forum, I have landed on this for the design:
Now the big question I have been struggling with that I can't seem to find tips or an answer on is where to start or, rather, method of attack, so to speak. I don't need specifics to my exact design, but am looking for general answers. Do I start at the very bottom and work my way up and hit the branches? Or do I start with all of the branches and temporarily hold them in place and finally attach them to the stack components?
I hope what I am asking makes sense. I am just looking to find the answer of "I have the designed, measured and roughly to specs, besides buying the fittings and pipe, what is the next step after that?" I have replaced and added on previously so have the experience and skills necessary, I just don't have much experience with a blank slate so to speak. Thanks!
Now the big question I have been struggling with that I can't seem to find tips or an answer on is where to start or, rather, method of attack, so to speak. I don't need specifics to my exact design, but am looking for general answers. Do I start at the very bottom and work my way up and hit the branches? Or do I start with all of the branches and temporarily hold them in place and finally attach them to the stack components?
I hope what I am asking makes sense. I am just looking to find the answer of "I have the designed, measured and roughly to specs, besides buying the fittings and pipe, what is the next step after that?" I have replaced and added on previously so have the experience and skills necessary, I just don't have much experience with a blank slate so to speak. Thanks!