Hi all, new to forum but have read a lot on here.i have a new driven 2" galvanized point well at my camp. Everything has went well so far, I have found water 35' down with 49' of pipe in the ground-so 14' of water in pipe with a 4' point. My questions are:
1-I have a single pipe packer setup already, but at what level should you install the leathers/ejecter? Like right above the 4' point?
2-I had some friends tell me I should install an extension pipe (with the foot valve on)below the ejector that would end in the middle of point. Like a 1" pipe extension below the leathers/ejector. Is this correct?
Appreciate any and all answers, this site is pretty informing for "frugal" diy people, lol
1-I have a single pipe packer setup already, but at what level should you install the leathers/ejecter? Like right above the 4' point?
2-I had some friends tell me I should install an extension pipe (with the foot valve on)below the ejector that would end in the middle of point. Like a 1" pipe extension below the leathers/ejector. Is this correct?
Appreciate any and all answers, this site is pretty informing for "frugal" diy people, lol