Pat G.
New Member
I was at Great Wolf Lodge this weekend with my kids (chain of indoor water parks for the unfamiliar) and was marveling at the water supply plumbing for the water slides. It looked like plain old PVC with the various elbows and markings, etc, just on a massive scale, looking like 12-18” OD to my eyes.
I have no intention of ever working on this stuff, but was curious as to how the pros handle stuff this massive and presumably heavy. Do you use us standard primer and cement? How do you cut it? Etc?
It looked like some crazy stuff to plan and install, especially as some of the runs were 3-5 stories tall and putting massive volumes of water into the slides.
I have no intention of ever working on this stuff, but was curious as to how the pros handle stuff this massive and presumably heavy. Do you use us standard primer and cement? How do you cut it? Etc?
It looked like some crazy stuff to plan and install, especially as some of the runs were 3-5 stories tall and putting massive volumes of water into the slides.