PlmbrTalk
New Member
- Messages
- 2
- Reaction score
- 0
- Points
- 1
Hello All,
This is my first time on the forum, so glad to be here, sharing in the knowledge. I'm not used to drafting plans, but this job required it. I got the following comment from the plumbing plans reviews and don't know how to fix my plan: "Horizontal wet vent shall be the vent for the fixtures and shall extend from the dry vent along the direction of flow in the drain pipe to the most down stream fixture". The way he put it is hard for me to understand. Any ideas no how to fix this plumbing plan? It is attached. Thanks for your help.
This is my first time on the forum, so glad to be here, sharing in the knowledge. I'm not used to drafting plans, but this job required it. I got the following comment from the plumbing plans reviews and don't know how to fix my plan: "Horizontal wet vent shall be the vent for the fixtures and shall extend from the dry vent along the direction of flow in the drain pipe to the most down stream fixture". The way he put it is hard for me to understand. Any ideas no how to fix this plumbing plan? It is attached. Thanks for your help.