GoVolz
New Member
I'm remodeling my bathroom and extending the shower 6 feet further left if the picture and the toilet 3 feet left of it's current location. My idea is to cut just left of the cast iron vent in and between the toilets transition piece and connect with a similar size pvc pipe. And basically extend it in the same direction as the way the current cast iron is by extending it 5 feet or so. Leave a clean out at the end just as the cast iron has and tie in the new shower location and toilet location. Is this logical or is there a better way. Also I'm assuming I will have to tie in a new vent since the shower and toilet are further from the stack. Is thag correct? Your help is appreciated. Thanks.