I am adding a bathroom to my house where the garage (storage) used to be.. Concrete floor... had to cut it and run the waste line for the bathroom.
The toilet is the starting point for the waste line, and goes about 2' then has a 22 angle in it then straight for about 40'-50', before it has a 45 bend in it, and then it has a double angle cleanout.
The waste line will be buried in concrete for first 20' then it will be in the drawl space....
My question is... Do I need to add a cleanout near the toilet, or can the toilet be used as a cleanout? Will the inspector accept it? This is in King County (un-incorporated Bellevue) area in WA.
Thank you!
The toilet is the starting point for the waste line, and goes about 2' then has a 22 angle in it then straight for about 40'-50', before it has a 45 bend in it, and then it has a double angle cleanout.
The waste line will be buried in concrete for first 20' then it will be in the drawl space....
My question is... Do I need to add a cleanout near the toilet, or can the toilet be used as a cleanout? Will the inspector accept it? This is in King County (un-incorporated Bellevue) area in WA.
Thank you!