K2
Member
Hey guys, I'm getting ready to remodel the bathroom, i have it stripped down to the studs and subloor (which is 2x12 on top of 6x6 spaced 36").
I'm going to tile the whole bathroom on top of a mortar bed. My question is what i have to consider with all of the rough plumbing for a toilet, shower, freestanding, bathtub and pedestal sink.
Is it safe enough to assume I can just run the drains up high enough to clear the 'to-be' mortar bed and connect them after the tiling? Any special considerations for the toilet flange?
I have access to the floor from underneath.
Any thoughts are appreciated!
I'm going to tile the whole bathroom on top of a mortar bed. My question is what i have to consider with all of the rough plumbing for a toilet, shower, freestanding, bathtub and pedestal sink.
Is it safe enough to assume I can just run the drains up high enough to clear the 'to-be' mortar bed and connect them after the tiling? Any special considerations for the toilet flange?
I have access to the floor from underneath.
Any thoughts are appreciated!