Proper way to test rough in with Tubs?

Users who are viewing this thread

GShelton

New Member
Messages
22
Reaction score
0
Points
0
Location
Central Florida
Website
www.houseofshelton.com
OK, I have searched and read and searched and read...

I am getting ready for the second rough-in inspection. I have all the DWV pipe installed in the house (minus the trap for the main bath tub which will be in tomorrow.)

At this time, I have not connected the master tub to the trap (and will be in the same situation with the main tub) as I am unsure how to go about plugging off the pipes for the test (our area requires the water fill test.)

If I was to use a Fernco cap to just cap off the trap, how do I test the bathtub for leaks? (Or is this not a requirement of the inspection?)

I apologize if this is a dumb question, but I really tried to find the answer and talking to the building department makes me want to claw my own eyes out. (They will likely just make up an answer anyway.)

As always, I thank you in advance!
 

Chassis

Engineer
Messages
340
Reaction score
0
Points
16
Location
SE Pennsylvania
I was given the advice on this site to fill the tub by closing the normal tub drain. Let it sit overnight. Then let the water out of the tub, watching the trap and drain line for leaks.
 

GShelton

New Member
Messages
22
Reaction score
0
Points
0
Location
Central Florida
Website
www.houseofshelton.com
Gotcha on that part. The problem I am having is that I need to pressure test the entire DWV pipe system. If I actually hook up the tub, I do not know how to go about plugging the piping in the tub drain (mainly the overflow.)

Does this make sense?
 

hj

Master Plumber
Messages
33,603
Reaction score
1,042
Points
113
Location
Cave Creek, Arizona
Website
www.terrylove.com
test

Building departments are not in the business of giving advice. It is a comprehension and liability issue. It is also why their approved plans says that their approval does not give you license to do anything improper or illegal, even if it is shown that way on the plan. Depending on the drain type, many manufacturers produce plugs to seal the drain and overflow openings so you can test the piping.
 

GShelton

New Member
Messages
22
Reaction score
0
Points
0
Location
Central Florida
Website
www.houseofshelton.com
Building departments are not in the business of giving advice. It is a comprehension and liability issue. It is also why their approved plans says that their approval does not give you license to do anything improper or illegal, even if it is shown that way on the plan.

Sorry, I should have clarified what I meant. (I knew in my head what I was thinking. LOL!) I just meant as far as asking the county IF the tub had to be hooked up during the 2nd rough in.

Depending on the drain type, many manufacturers produce plugs to seal the drain and overflow openings so you can test the piping.


I can not/did not find anything to plug it from the manufacturer. They do make a plug, but it is for a different model.

I ended up plugging the drain on the main tub (cast iron and fun to install by myself) with a 1 1/2 inch expansion plug (the one with the wing nut.) The over flow I capped off by making a plate to screw on and used a piece of mouse pad as a gasket.

The master tub I have no idea how to cap off. The drain I installed is one of those cable driven ones so it has mechanics in the center of the hole. No way to get a plug in the drain as it is too shallow. The bolt head bottoms out before the rubber ring makes it into the opening.

I decided to plumb up to the san tee at the master tub and just installed a Ferco cap. If they come for the inspection and need the tub hooked up, I will just have to have a re-inspect.

Now I am just waiting for my Kerdi drains to arrive and the entire DWV system is done.

Thanks for the input. :)
 

Seaneys

New Member
Messages
192
Reaction score
0
Points
0
Location
Chicago Suburbs
I love the mousepad gasket idea. I'm going to try the same trick with and offset toilet flange I am having problems plugging.

Thanks,
STeve
 

jdf405

Electrical Engineer
Messages
54
Reaction score
0
Points
6
Location
Los Angeles Area
As a novice DIY plumber I recently had this question as well. I called my building inspector and asked what they needed to see in terms of tub drain for the rough in inspection. In my area (Redondo Beach, CA - next to LA) I only had to have the drain line routed to the approximate location of the tub for the fill test.

I then bought re-usable plugs at HD or Lowes (Oatey makes some) that you stick in the ABS and tighten.

After the rough in inspection I installed my tub and glued on the p-trap and connected to the tub. All is good & the inspector is happy (for a change...)

Good luck!

OK, I have searched and read and searched and read...

I am getting ready for the second rough-in inspection. I have all the DWV pipe installed in the house (minus the trap for the main bath tub which will be in tomorrow.)

At this time, I have not connected the master tub to the trap (and will be in the same situation with the main tub) as I am unsure how to go about plugging off the pipes for the test (our area requires the water fill test.)

If I was to use a Fernco cap to just cap off the trap, how do I test the bathtub for leaks? (Or is this not a requirement of the inspection?)

I apologize if this is a dumb question, but I really tried to find the answer and talking to the building department makes me want to claw my own eyes out. (They will likely just make up an answer anyway.)

As always, I thank you in advance!
 
Top
Hey, wait a minute.

This is awkward, but...

It looks like you're using an ad blocker. We get it, but (1) terrylove.com can't live without ads, and (2) ad blockers can cause issues with videos and comments. If you'd like to support the site, please allow ads.

If any particular ad is your REASON for blocking ads, please let us know. We might be able to do something about it. Thanks.
I've Disabled AdBlock    No Thanks