I have 2x4 rafters running a span of 7’6†from the floor to the knee wall. The rafters were supported every other rafter at the knee wall. I plan to add 2x4s to fill in the rest. These would be 16†o.c.
The next span is from the knee wall to an existing wall that I would like to partially remove. This span is 8 feet. I’d like to move the wall in towards the peak of the roof about 4’6â€, but I’m concerned that the existing wall is load bearing. I would be removing about 5 studs from the wall.
The span from the wall I’d like to move and the peak is also 8’.
Any suggestions on how to properly support the roof when I remove this wall?
I’ve attached some pictures of the area. Let me know if you need additional information.
Thanks
The next span is from the knee wall to an existing wall that I would like to partially remove. This span is 8 feet. I’d like to move the wall in towards the peak of the roof about 4’6â€, but I’m concerned that the existing wall is load bearing. I would be removing about 5 studs from the wall.
The span from the wall I’d like to move and the peak is also 8’.
Any suggestions on how to properly support the roof when I remove this wall?