Re: shower rough in copper plumbing
Posted by hj on June 09, 2004 at 11:09:51:
In response to Re: shower rough in copper plumbing
Either is okay. It can even be further behind the backer board, just do not put it so far behind the backer board that a shower arm will not reach it.

: I am remodeling my mother's bathroom and i am making a walk in shower area for her and am ready to put the copper in. I am going to put support block behind every shower head/faucet/diverter valve and want to know does it matter how far back the threaded connection is in the wall for all these connections? I was thinking it should either be flush with the backside of the cement backer board or should it be flush with surface of the backerboard? Thanks.




Replies to this post
There are none.