| Posted by e-plumber on April 07, 2004 at 15:37:22: | |
|---|---|
| In response to Re: re-packing an abs to cast iron connection | |
|
: I'm replacing a 16" cast iron riser to a toilet with abs. I'm told it's OK to use okum with mortar in the old cast iron hub. : What is the proper amount of okum to pack onto the joint before I seal it with the mortar? I'm guessing I should leave about 3/4" space above the okum for the mortar. Is this right? Reply: |
|
| Replies to this post |
|