| Posted by Leaky on February 24, 2004 at 15:53:56: | |
|---|---|
|
We are trying to put in a new bathroom, tub, sink and toilet. Here's what we were thinking; Starting at shower;2"drain to sink area where the sink 1.5" ties in then continuing with 2" to 3" drain after toilet elbow. Venting;2" going up from tub over to sink hooking up with sink then going over to 3" vent stack . Sound OK? Did I loose ya? |
|
| Replies to this post |
|