Re: Setting Commercial wall Hung
Posted by Deb on February 05, 2004 at 11:18:40:
In response to Re: Setting Commercial wall Hung
: I am setting a wall hung urinal & wall hung bowl for the first time. The rough-in was performed by a contractor who was since run off the job.

: His rough-in includes a 2" outlet for the urinal and 4" outlet for the bowl. These outlet stubs are flush with the wall and capped off. The carrier frame is installed, all centers match the fixtures and flush valves. The rough-in has passed inspection.

: Now, what is the best way to go about making these outlet connections with the fixtures? Does some kind of a closet flange get attached to these stubs? What is the best type of gasket to seal these connections?

: Fixtures are Kohler (Kingston) Bowl and Kohler (Freshman) Urinal.

: I would appreciate it if any experienced commercial plumbers could help.

This sounds like a commercial building. Most code dictates that a licensed plumber do ALL the plumbing in commercial places to protect the public. You might want to check before you proceed.
Deb
The Pipewench


Replies to this post
There are none.