| Posted by jimbo on December 22, 2003 at 09:37:33: | |
|---|---|
| In response to Re: PVC vs. ABS | |
|
PVC, schedule 40 or even better, schedule 80. ABS drain pipe carries no pressure schedule rating at all; it is not actually solid, but foam-core. |
|
| Replies to this post |
| There are none. |