| Posted by Kevin on December 12, 2003 at 16:23:28: | |
|---|---|
| In response to Re: Drill or Jackhammer the concrete of basement when installing new tub. | |
|
BTW, the builder told me that the concrete is about 4 inch and gravel below that. thanks again! : Hi, : I'm trying to finish my basement by myself. The drain left by builder need to be moved by about 10 inch. Therefore, digging into the concrete seems to be a "have to" job. I'm wondering if I can use drill to finish this work instead of jackhammer. I'm afraid of jackhammer is too BIG for this job and may damage concrete. If I can use drill, how do I proceed? Any advice would be highly appreciated. : Thank you very much for taking your time and giving me some advice.
|
|
| Replies to this post |
|