| Posted by h on June 10, 2003 at 09:52:39: | |
|---|---|
| In response to Re: Plumbing upstairs in unfinished areas of modular home | |
|
You don't want to put a trap there, and if you can run the pipe down that wall then it should work, as long as you can get the plumbing in a 2x8 ceiling. : What if I ran a trap behind the knee wall and sloped it down above the knee wall till it reached the connections, or what if a dropped a new drain down the same wall as the supply lines and hooked to the drains in the crawl space? : Steve
|
|
| Replies to this post |
| There are none. |