| Posted by Steve Reynolds on May 30, 2003 at 13:34:17: | |
|---|---|
|
I am adding a bath to my upstairs that currently has no plumbing. I have 2"x8" floor joists. It seems like I am limited to bringing the 3" drain down somewhere between the two joists that my toilet happens to sit between. I can't drill a 3.5" hole. Is there any engineering solution? I would be willing to add floor joists, although these new joists would have to have a hole drilled through them also.
|
|
| Replies to this post |
|