Re: Ceramic tile & toilet - from scratch
Posted by hj on May 20, 2003 at 22:40:18:
In response to Re: Ceramic tile & toilet - from scratch
The tile should be about 3/4" from the pipe so the socket can go down over the pipe.
: We are installing ceramic tile on cement for a basement bathroom. No toilet has been installed, though it is stubbed in and the top of the pipe is level with the cement floor.

: What is the proper procedure for installing the tile and toilet? I have had trouble finding guidance on this subject. This is our first experience with laying ceramic tile and we want to be prepared.

: Do we tile approximately up to the edge of the hole in the cement and then place the flange over the top of the tile and work from there?

: Are there things we should watch out for, avoid or do to prepare?

: Answers to these questions or a URL to guidance on this subject would be greatly appreciated




Replies to this post
There are none.