basement bathroom
Posted by David Haubner on March 31, 2003 at 16:44:12:
I am going to put in a shower, toilet,and sink in the basement of my home. this means busting up the floor and tying into the main stack. the venting part i have figured out,what i need to know is there a specific order that the fixtures must be attached to the new branch line going into the main stack (ie. shower 1st,toilet 2nd,sink 3rd or toilet 1st, shower 2nd, etc),or doesn't it matter? any comments or suggestions would be appreciated


Replies to this post