| Posted by Terry Love on November 28, 2002 at 12:15:43: | |
|---|---|
| In response to Re: Installing tub on concrete | |
![]() If you were to break out the concrete at the tub, you would find a p-trap below the 1.5" stub. : The tub drain is 1.5" PVC stubbed up through the concrete floor almost right up against the wall in the middle of the drain end of the tub and there's no well around it to drop the drain below the floor level.
|
|
| Replies to this post |
| There are none. |