Clarification
Posted by L. Fisher on October 15, 2002 at 17:03:29:
In response to Clarification
To clarify my original posting, the 4" sewer line that runs right above my ejector pump runs about 8 feet down to the y-type sewage yoke on the basement wall that exits the foundation approximately 4' from the floor. There is a main clean out at that point. My thought was to tie in my waste pipe in by going up-and-over the 4" swere pipe above, then tying the vent in slighly downstream towards the wall. That is, if I have enough room between the 12" joists to get up and over so as to enter the top side of the pipe.




Replies to this post
There are none.