| Posted by Phil on April 25, 2002 at 10:53:48: | |
|---|---|
|
Is it ok to first tile around the toilet drain, butting the tile right up to it, and then after done, cut the existing, excess pipe/cap and install the flange directly over top the tile? Or should I cut the pipe before tiliny, level w/ the concrete for any reason? thanks. |
|
| Replies to this post |
|