Basement bathroom roughed in, but...
Posted by Jeff Varnes on March 06, 2002 at 11:18:04:
need help getting started. It's roughed in for a sink and toilet. I want to start laying it out, but don't know how far away to put the wall from the roughed in toiled drain. Also, the toilet drain currently sticks up above floor level w/ a cap glued onto it. I've done a bit of searching through past posts to find this out, but still not real clear...do I need to cut below level and chip concrete away or can I just cut it at floor level and get a flange that attaches inside the existing drain pipe?? Thanks.


Replies to this post