| Posted by More on December 27, 2001 at 19:50:44: | |
|---|---|
| In response to Check the Building Codes | |
|
The Department of Building and Safety covers the requirements for the Supply risers and the condensate return piping for your geographical area. Supply pipe for freezing areas like New York and New Hampshire are different than supply pipe for Arkansas and Kentucky. The three story supply will likely require check valve (backflow prevention) as well as cross connect protection, pressure regulators, and may allow decreasing supply side size as the pressure demand decreases. The pressure assist pump is oftentimes added mid span where the water column is heavy because of pipe size diameter and the supply pressure is not sufficient. The larger size supply pipe will lose its temperature holding capability very quickly, anbd therefore will require an insulation of high quality to prevent the pump cycling too often. Ask the building department about the type of non asbestos insulation materials they recommend.
: Any help or links for correct sizing or caluactions would be appreciated!!
|
|
| Replies to this post |
|