| Posted by Jeff on November 20, 2001 at 17:38:13: | |
|---|---|
|
I'm adding a second bathroom on the ground floor of my house. The bath was roughed in by the original builder (mid 70's) yet never completed. The toilet flange is not flush with the concrete floor but instead sits about 1/2" below the My question is ... Is it possible / advisable to add a vertical extension to a closet bend? Or do I need to bust
Thanks.
|
|
| Replies to this post |
|