Adding a lower level toilet
Posted by Pat on October 15, 2001 at 21:45:07:
A friend is adding a toilet in the basement. Planning on connecting to the main pipe. Got to the main pipe, there is a gap between the concrete floor and the piping. Is this right? How should we pour the concrete when we close it back up? what is the best size piping to use from the toilet to the stack? About 15-20' distance.


Replies to this post