New basement toilet
Posted by Ed Herzog on August 30, 2001 at 14:31:29:

I am in the process of finishing my basement and puting in a half bath in my basement. A waste stack is coming down from the first floor bath and I will be using a Studor mechanical vent for venting of the toilet plus the new sink. I already have a hole made for the rough in of the new half toilet flange. The attached bitmap link shows the current config of the PFC/DWV and below it the way that I would like to rough in for the new toilet. Does anyone see anything wrong with this?



Replies to this post
There are none.