| Posted by TK on April 05, 19100 at 09:45:07: | |
|---|---|
|
One more minor clarification... I have a 3" toilet drain extending 3-4" above the plywood subfloor. I am installing 1x1" mosaic ceramic tile. Do I cut the drain down to the plywood, flush with the tile, or do I install the tile and flange first, and THEN cut the drain pipe down flush with the flange??? ARGH! So close to finishing... |
|
| Replies to this post |
|