Re: Tiling a basement bathroom
Posted by hj on April 03, 19100 at 09:19:37:
In response to Re: Tiling a basement bathroom
You can do either, but tiling the concrete will be the best way, if you are using ceramic tile. If non-ceramic, be sure that the tile and cement is for use on below grade floors.

: We had our builder rough-in a bathroom in our basement and now we want to finish it. We are going to use tile for the bathroom floor. Can I put the tile directly on the poured concrete or do I have to install a subfloor before I do the tiling and the toilet?

: Thanks




Replies to this post
There are none.