| Posted by Al on April 01, 19100 at 13:53:23: | |
|---|---|
|
We had our builder rough-in a bathroom in our basement and now we want to finish it. We are going to use tile for the bathroom floor. Can I put the tile directly on the poured concrete or do I have to install a subfloor before I do the tiling and the toilet? Thanks |
|