| Posted by Bill Varian on March 15, 19100 at 22:49:54: | |
|---|---|
|
I have torn out my stand up shower stall down to the 2x4 walls and plywood floor. I have ordered new tile and concrete board for the walls... I have an old existing lead liner secondary containment which has a slight crack on it. Can the lead liner be repaired, somehow? or should I just say don't chance it and remove it? If I have to replace it should I put new plastic 2" drain in and connect it to the copper pipes I have? How exactly does the floor drain connect to the new liner,if I go that route, and get a proper seal? |
|
| Replies to this post |
|