| Posted by Joe Gabbard on March 02, 19100 at 11:01:29: | |
|---|---|
|
I am adding a second bathroom to, yes, a (gulp) one bathroom house. The new stack is approximately 17 feet from the existing stack. My question is: And if so, should I use a 1/4" per foot, 1/8" per foot, or GREATER slope I have 2 feet of vertical space (across the lateral 17 feet) to work with. Did I mention I have to cut an iron stack in a 3 foot high crawl space :) |
|
| Replies to this post |
|