| Posted by Bill on May 26, 1999 at 13:04:27: | |
|---|---|
|
I am/have currently installed 1/2" soft copper, flared to black/steel pipe and regulator w/shutoffs. Have pressureized system to 10 #s for ten minutes w/ no leaks. Regulators closed prior to pressurization. My question is, on the drip leg of the steel pipe, what length, will/ does southern bldg. code require to pass inspection. Thanks in advance: Bill |
|
| Replies to this post |
|