Water Main
Posted by Mark Hoss on January 16, 1999 at 19:21:18:
I am going to have someone build a basement with a poured basement wall.

I know the drain pipe will come up from the floor,
but does the main water line come through an opening left when the wall is poured,
or do I need to start drill a hole through after the wall is cured?



Replies to this post