Posted by Mark Hoss on January 16, 1999 at 19:21:18:
I am going to have someone build a basement with a poured basement wall.
I know the drain pipe will come up from the floor, but does the main water line come through an opening left when the wall is poured, or do I need to start drill a hole through after the wall is cured?
Replies to this post
Re: Water MainBud...Suncoast Plumbing Inc.20:10:58 1/16/99(0)
Re: Water MainBud...Suncoast Plumbing Inc.20:08:33 1/16/99(0)