| Posted by Michael Loffredo on November 19, 1998 at 08:49:07: | |
|---|---|
|
I had a plumber come in and rip out my old lead shower pan and replace it with a new PVC one. However, he only set the PVC and did not lay the concrete. I now have to do that myself. Should I pour the concrete first and then replace the wonderboard, or do I replace the board and then concrete? Also, what is the best conctrete to use? Any tips on mixing it so that I can create the slope? |
|
| Replies to this post |
|