| Posted by David on February 25, 19101 at 22:26:45: | |
|---|---|
|
I'm in the middle of re-modelling my bathroom. I have a American Standard Vent Away wall mounted toilet. I took it off the wall to replaster, re-tile etc. However, I should have made a note of the order of the nuts and washers so I can bolt it back on correctly. Anybody get any ideas? Maybe a contractors installation diagram? There's nothing on the Amercian Standard website. There are 2 backets bolted to the 2 by 6 wall studs, then there's 4 big treaded studs bolted to the brackets. I think I should install dryall, then tile, then put a nut of the threaded stud, then a washer (to protect the toiltet, then the toilets, then another washer, then then final chrome finishing nut. Help! |
|
| Replies to this post |
|