| Posted by Rob Ehret on February 05, 19101 at 23:07:51: | |
|---|---|
| In response to Re: Non-Plumbed Basement idea - will it work? | |
|
One more thing - when i said bottom of drain, what I meant was connecting a 'T' to the verticle pipe coming down from the ceing from the upper level toilet, putting the 'T' just before it goes into the slab. : Don't connect to the bottom of an existing drain. You would be creating a new low point for your system. You must pitch down (at least 1/4" per foot) to either level or above the existing drain line. Consider a sewage ejector if it's real important for you to add this to your basement.
|
|
| Replies to this post |
|