| Posted by WILL K on December 15, 19100 at 07:10:32: | |
|---|---|
|
I AM INSTALLING A BASEMENT BATHROOM AND WOULD LIKE TO KNOW THE PROPER WAY TO TAP INTO THE CLEANOUT. THE CLEANOUT LINE IS 3FT UNDER THE BASEMENT SLAB. THE HOUSE HAS A WALKOUT BASEMENT. THE BATHROOM WILL HAVE FOUR FIXTURES. I DON'T KNOW IF I HAVE TO DIG OUT A 3FT TRENCH TO THE TOILET ON ONE SIDE OF THE CLEANOUT LINE AND THE SAME ON THE OTHER SIDE FOR THE BATHTUB, OR IS IT POSSIBLE TO DIG A 1FT AND TAPER INTO THE VERTICAL CLEANOUT THAT IS COMING UP FROM THE 3FT DEPTH BY THE WATER METER. ANY HELP WOULD BE APPRECIATED. |
|