| Posted by J. Henze on December 09, 19100 at 01:55:09: | |
|---|---|
|
I'm having a bathroom built on the second story of my home. The shower stall is custom and built by a contractor. My brother also is a contractor and told me that we need pvc under the cement board on the floor and covering the bench seat before we can pour the cement for the floor. Before I address this with the contractor we have hired I would like some advice before he pours the floor. The cement board is screwed in but not glued so there is still time to correct it if needed. The entire shower will be tiled including the ceiling. |
|
| Replies to this post |
|