shower drain
Posted by Phil Probert on September 23, 19100 at 17:52:20:
I'm getting ready to install a shower in my basement. It will be utilizing the same vented drain that washing mashine and upstairs bath use. I'm wondering if it's alright to raise the shower (build a subfloor), cut a hole in the concrete to accept the p-trap and then run the drain at floor heigth over to the existing drain. It would tie in just below the washing machine drain inlet. If this is acceptable, how high should the drain in the shower be above the inlet to the main drain.


Replies to this post