adding a second full bath
Posted by Paul De Santis on August 27, 1998 at 23:28:14:
I'm adding a second story addition to my 750 sq.ft.ranch style home. I will be adding a full bath upstairs. The current plumbing needs to be repiped(supply lines and waste)as it is all galvanized and 57yrs. old. I have only a basic understanding of plumbing which I acquired through the books I have read on the subject. Should I attempt to do this on my own? I'm not afraid to do it and I'm somewhat mechanically inclined. I also have access to experienced individuals who can offer me advice along the way. What do you think?
P.S. I will be installing a whirlpool tub, shower, toilet and sink.


Replies to this post