I am going to be installing a 1000 Gallon 4000 PSI grease trap and a duplex pump for this resturant owner. I am curious as to how to price this job out. I will be doing all the work and not subing anything out. All I wanna know is a ball park figure I should charge. I have a number in mind but I want to see what you guys think and see if I am on the right track.
I have included some photos from the Plans as reference. Hopefully that will help a bit.
Here is the scope of work :
1. Remove Existing sewage pump & chamber and remove existing water closet
2. Cut up concrete floor on interior as per engineer drawing to install the new plumbing lines
3. Tear out existing sidewalk next to porch on the exterior rear, and excavate area for new 1000 Gallon tank location and plumbing
4. Remove backfill and concrete debris from job location to proper disposal facility
5. Once all prep work has been completed the tank shall be ordered, delivered, and set into place
6. All necessary plumbing and electrical connections will be made at this time
7. Call for rough inspection
8. After all the plumbing work has been completed, concrete shall be poured to cover all exposed piping on the inside of the property
9. Backfill remaining area around Holding Tank (Exterior)
10. Form and re-pour concrete side walk in the rear
11. Clean and dispose of any left over debris
12. Call for final township inspection
I have included some photos from the Plans as reference. Hopefully that will help a bit.
Here is the scope of work :
1. Remove Existing sewage pump & chamber and remove existing water closet
2. Cut up concrete floor on interior as per engineer drawing to install the new plumbing lines
3. Tear out existing sidewalk next to porch on the exterior rear, and excavate area for new 1000 Gallon tank location and plumbing
4. Remove backfill and concrete debris from job location to proper disposal facility
5. Once all prep work has been completed the tank shall be ordered, delivered, and set into place
6. All necessary plumbing and electrical connections will be made at this time
7. Call for rough inspection
8. After all the plumbing work has been completed, concrete shall be poured to cover all exposed piping on the inside of the property
9. Backfill remaining area around Holding Tank (Exterior)
10. Form and re-pour concrete side walk in the rear
11. Clean and dispose of any left over debris
12. Call for final township inspection