New Member
hey all
I'm installing a window well and will run a pipe down to the existing drain tile... few questions
should I tie in directly or leave the pipe just above the existing drain tile (in the drainage field)
if I do I tie with a T.. what's the best option? pretty sure I have that black ridged pipe for my existing drains (the flex pipe). from the well..should I run a hard pvc to a pvc T and have the black ridged pipe connect to that.. .or would it be best to have a ridged T (like this ) connect to the existing pipe then run a ridged flex pipe all the way up?
I'm installing a window well and will run a pipe down to the existing drain tile... few questions
should I tie in directly or leave the pipe just above the existing drain tile (in the drainage field)
if I do I tie with a T.. what's the best option? pretty sure I have that black ridged pipe for my existing drains (the flex pipe). from the well..should I run a hard pvc to a pvc T and have the black ridged pipe connect to that.. .or would it be best to have a ridged T (like this ) connect to the existing pipe then run a ridged flex pipe all the way up?