Bobby Hockensmith
New Member
We are having a custom home being built which is almost complete. 75% of the basement is finished off with a powder room. The builder installed a macerating toilet which also has the drain from the sink connecting to it. When I asked him why this method was chosen he said it was more efficient and easier to troubleshoot and repair. I could see the part of troubleshooting since the grinder and pump is all exposed behind the powder room wall located in the unfinished area. It had been planned at the early stages before the foundation was poured to have a bathroom. Did my builder take a short cut?