kingtuna
New Member
Hi. Years of off and on reading, 1st post. In researching installing a basement 1/2 (or maybe 3/4) bath, I see that the sewage pit needs its own dedicated roof vent and the discharge must be at least 10 feet down the horizontal line (wye take off on top) from other fixtures. Now I wonder if my washer and sink pump (floor box) is correct. It vents out the sidewall and discharges into the vertical stack. Is this OK? If not, does it need its own vent, or can it tie up to the existing vent stack? Does it also need to discharge 10 feet or more down the line? If so, can it share the wye (san tee at the drop down to the wye?) that I add for the sewage pit? Can it share the vent I add for the pit?
Thanks much.
Thanks much.