Could anyone please give me some advice; I'm planning to do a basement renovation in the next week or so , adding a shower and moving a toilet. I was wondering what I should do when I tie in to my sewer line which is under the concrete slab. Above slab it's abs pipe 3" and a secondary 2" line 4 inches
away( I'm assuming the 2" pipe connects to the main sewer line at some point
below surface) they both connect into cast iron which runs through the floor.
Should I replace both lines with abs pipe and run them through the concrete floor instead of having the old cast iron/ abs old connections or just tie into the cast iron further down the sewer line.
I hope this makes sense!!??
Thanks for any help
away( I'm assuming the 2" pipe connects to the main sewer line at some point
below surface) they both connect into cast iron which runs through the floor.
Should I replace both lines with abs pipe and run them through the concrete floor instead of having the old cast iron/ abs old connections or just tie into the cast iron further down the sewer line.
I hope this makes sense!!??
Thanks for any help