In Ontario, and just acquired a property. Removed a basement ceiling and discovered a wet vent installation that I don't think is quite up to code. Wet vent is 1-1/2 ABS. Wet vent drains a washing machine stand pipe located on main floor. This is the only fixture upstream of wet vent. Downstream is one WC located on basement concrete
Far as I know, wet vents with one WC downstream must be 2" diameter.
Assuming I'm correct, then I'll have to break open concrete in order to fix. I am contemplating letting this repair wait for a year or two, but am wondering what the possible repercussions will be in the meantime. Slow flushing toilet while laundry is draining? Anything else to worry about?
Thanks in advance.
In Ontario, and just acquired a property. Removed a basement ceiling and discovered a wet vent installation that I don't think is quite up to code. Wet vent is 1-1/2 ABS. Wet vent drains a washing machine stand pipe located on main floor. This is the only fixture upstream of wet vent. Downstream is one WC located on basement concrete
Far as I know, wet vents with one WC downstream must be 2" diameter.
Assuming I'm correct, then I'll have to break open concrete in order to fix. I am contemplating letting this repair wait for a year or two, but am wondering what the possible repercussions will be in the meantime. Slow flushing toilet while laundry is draining? Anything else to worry about?
Thanks in advance.