    We are installing a PVC drain waste vent system in our new home. Our state's building code requires that we water test the system with a minimum of 3' of head above the highest fitting. Please review our plan for testing this and let me know if there are any errors in my method.

    After installing all the pipes (drain and vent) we'll cap all the exposed ends except for the vent pipe where it exists the roof. We have a clean-out, on the outside of the house (which is created by the installation of a 4"x4"x4" combo wye in the line). We plan to insert an inflatable test balloon into the line, via this cleanout. Now, we haven't purchased this test balloon but I was thinking about this one: http://webstore.petersenresources.com/item_detail.aspx?ItemCode=130004M.

    I assume that one can fill this balloon once it's in place via an air hose. My question is about deflating the balloon when the test is done in order to release the water so that it can flow on down the line to the septic tank. Since I've never used or seen one of these test balloons, I'd appreciate any advice that can be offered here. The instructions with the balloon say to release the back pressure before deflating it, but I don't see any way to do that.

    Thank you in advance for your advice.
  2. nukeman

    nukeman Nuclear Engineer

    Messages:
    709
    Location:
    VA
    You may need the long style test balloon to reach down the cleanout and into the main line. Basically, you inflate the balloon to 25psi or so and fill your system up. There is a metal ring attached to the balloon, so the balloon won't wash away if it deflates/slips. Once the test is done, slowly release the air from the balloon and it will let the water flow past and into the septic. You may have some water splash out of the cleanout when the air is released.

    You are a bit lucky that you only need to test with 3' of head as many places require 10' of head.

    I do have a long 4", a regular 4", and a 2" balloon from my test (only used once). If the PMs would work on here, we could arrange something (4" regular or 4" long). I don't need them anymore, so they might as well go to someone who can.
  3. Redwood

    Redwood Master Plumber

    Messages:
    7,452
    Location:
    Connecticut
    Last edited: Oct 21, 2010
  4. shacko

    shacko Master Plumber-Gas Fitter

    Messages:
    561
    Location:
    Rosedale, Md
    ...I assume that one can fill this balloon once it's in place via an air hose....

    Thats right, and when the test is done you can deflate the ball from the end of the hose.
  5. techinstructor

    techinstructor New Member

    Messages:
    81
    Location:
    North Carolina
    The code actually did require 10' of head but then it included this exception:
    I am definitely interested in getting the long 4" inflatable plug. I tried to PM you but I'm not sure if you got it. In the event you didn't get it, you can email me at techinstructor07@gmail.com.

    Thanks
  6. nukeman

    nukeman Nuclear Engineer

    Messages:
    709
    Location:
    VA
    Email sent.
Similar Threads: Testing Drain
Forum Title Date
Plumbing Forum, Professional & DIY Advice, Tips & Testing this new Drain Nov 22, 2009
Plumbing Forum, Professional & DIY Advice, Tips & Testing Drain Lines Oct 5, 2009
Plumbing Forum, Professional & DIY Advice, Tips & Testing PVC drain lines Dec 28, 2006
Plumbing Forum, Professional & DIY Advice, Tips & Testing a new faucet Aug 8, 2014
Plumbing Forum, Professional & DIY Advice, Tips & Pressure Testing new boiler piping Aug 12, 2013

Share This Page